首页> 外文期刊>Nuclear news >Decommissioning: The new goal of the Fukushima Daiichi road map
【24h】

Decommissioning: The new goal of the Fukushima Daiichi road map

机译:退役:福岛第一核电站路线图的新目标

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

On April 17, 2011, just over a month after the massive earthquake and tsunami hit the Fukushima Daiichi nuclear power station, Tokyo Electric Power Company (Tepco) issued a "road map" to recovery, setting out a pathway to bring the plant's damaged reactors back under control within nine months and to make the plant and site safe again. Tepco then developed and pursued a plan of action based on the road map, formally called the Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, aimed at stabilizing the reactors and significantly reducing emissions from the site.
机译:2011年4月17日,就在福岛第一核电站遭受大地震和海啸袭击后的一个多月,东京电力公司(Tepco)发布了一份“恢复路线图”,为该厂受损的反应堆的修复指明了道路在9个月内恢复控制,并再次确保工厂和现场安全。然后,东京电力公司根据路线图制定并实施了一项行动计划,该路线图正式称为《福岛第一核电站事故恢复路线图》,旨在稳定反应堆并显着减少场地排放。

著录项

  • 来源
    《Nuclear news》 |2012年第3期|p.48-51|共4页
  • 作者

    Dick Kovan;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号