Overview of Mid- and Long-Term Roadmap Towards the Decommissioning and the Status of Nuclear Material Management at Fukushima Daiichi Nuclear Power Station

机译:福岛第一核电站退役中长期路线图概述和核材料管理状况

获取原文

摘要

With the completion of Step 2 as an achievement of stable state, Japanese government andTokyo Electric Power Company (TEPCO) set the “Mid- and Long-Term Roadmap towardsthe Decommissioning of Fukushima Daiichi Nuclear Power Station Units 1-4, TEPCO” onDecember 21, 2011, which was made in response to the joint ministerial order, and decided bythe Government-TEPCO Mid- and Long-Term Response Council. After the completion ofStep 2, the effort will now be shifted from trying to achieve plant stabilization to maintainingthat stable status. In parallel, it is vitally important that the fuel removal from the Spent FuelPools (SFPs) of Units 1-4, removal of fuel debris from the Reactor Pressure Vessels (RPVs)and Primary Containment Vessels (PCVs) of Units 1-3, and other measures towardsdecommissioning, should continue over the mid- and long-term.
机译:作为稳定状态的成果,完成了第二步,日本政府和 东京电力公司(TEPCO)制定了“中长期路线图 东京电力公司福岛第一核电站1-4号机组的退役” 根据2011年12月21日的联合部长级命令作出,并由 政府TEPCO中长期响应委员会。完成后 步骤2,现在将工作从尝试实现工厂稳定转移到维护 那个稳定的状态。同时,至关重要的是从乏燃料中去除燃料 1-4号机组的水池(SFP),从反应堆压力容器(RPV)中清除燃料碎片 第1-3单元的主安全壳(PCV),以及针对该安全壳的其他措施 退役,应在中长期内继续进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号