...
首页> 外文期刊>Nuclear news >Renaissance Watch
【24h】

Renaissance Watch

机译:文艺复兴时期的手表

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In what follows, Bold capitals are used for projects under (or approved for) construction; bold indicates a submitted application; italics means that an application is forthcoming. Acronyms: ACRS, Advisory Committee on Reactor Safeguards; ASLB, Atomic Safety and Licensing Board; COL, combined construction and operating license; COLA, COL application; CS, proposed date for the start of commercial operation; EPC, engineering, procurement, and construction; ESP, early site permit; FEIS (DEIS), final (draft) environmental impact statement; FSER (DSER), final (draft) safety evaluation report; ITAAC, inspections, tests, analyses, and acceptance criteria; MH, mandatory hearing and final decision; RAI, request for additional information; TBD, to be determined.
机译:在下文中,大胆的资金用于在建(或批准用于建设)的项目;粗体表示已提交申请;斜体字表示即将提出申请。缩略语:ACRS,反应堆保障咨询委员会; ASLB,原子安全和许可委员会; COL,综合施工和经营许可证; COLA,COL应用; CS,建议开始商业运营的日期; EPC,工程,采购和建筑; ESP,早期现场许可证; FEIS(DEIS),最终(草案)环境影响声明; FSER(DSER),最终(草案)安全评估报告; ITAAC,检查,测试,分析和验收标准; MH,强制听证和最终决定; RAI,要求提供其他信息;待定,待定。

著录项

  • 来源
    《Nuclear news》 |2014年第4期|30-31|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号