...
首页> 外文期刊>Nuclear news >DOE begins recovery work at WIPP
【24h】

DOE begins recovery work at WIPP

机译:DOE开始在WIPP进行恢复工作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Following a radiological event at the Department of Energy's Waste Isolation Pilot Plant (WIPP), the DOE and its site management and operations contractor, Nuclear Waste Partnership (NWP), announced on March 9 that they have initiated the first phase of an underground recovery process that will lead to the resumption of nuclear waste disposal operations. The DOE and NWP said that they were expecting to send personnel into WIPP s underground facility "as soon as the end of the week" to characterize the mine's stability and attempt to identify the source of the release.
机译:在能源部废物隔离试点工厂(WIPP)发生放射性事件之后,能源部及其现场管理和运营承包商核废料伙伴关系(NWP)于3月9日宣布,他们已启动地下回收过程的第一阶段。这将导致恢复核废料处理业务。 DOE和NWP表示,他们希望“最快在本周末结束时”将人员派到WIPP的地下设施,以表征矿山的稳定性并试图确定释放源。

著录项

  • 来源
    《Nuclear news》 |2014年第4期|59-62|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号