Owners of power reactors now in operation can maximize their investments by taking advantage of either, or both, of two options available through the Nuclear Regulatory Commission: license renewal, which can add 20 more years to the term of an operating license; and power uprates, which can allow higher power output from the original fundamental reactor hardware. Both options require a licensee to show that its plant can continue to operate safely, involve NRC staff reviews, and include the possibility of public hearings. The license renewal process generally takes about 22 months for an uncontested proceeding and about 30 months for one with hearings. Renewal applications with hearings being held by Atomic Safety and Licensing Boards are indicated below in bold italics. There are three different kinds of power uprates-a reactor might, in theory, be given one, two, or all three-and the NRC process is more case-by-case and less subject to rigorous scheduling in advance than the license renewal process. Both options can also be influenced generically by developments in industry-backed projects from organizations such as the Nuclear Energy Institute and reactor vendors.
机译:现在运行中的反应堆所有者可以利用核监管委员会提供的两种选择中的一种或两种,来最大化其投资:许可更新,可以将运行许可的期限再增加20年;和功率提升,可以从原始基本反应堆硬件输出更高的功率。两种选择都需要被许可方证明其工厂可以继续安全运行,需要NRC工作人员进行审查,并包括公开听证的可能性。对于无争议的程序,许可证续签过程通常需要大约22个月,而举行听证会则需要大约30个月。原子安全和许可委员会举行的听证会的续签申请在下面以粗斜体表示。有三种不同的功率提升率-从理论上讲,一个反应堆可能被赋予一个,两个或全部三个-而且NRC过程比许可证更新过程更为个案,并且不需要事先进行严格的调度。两种选择也都可能受到诸如核能研究所和反应堆供应商等组织的行业支持项目发展的一般影响。

著录项

  • 来源
    《Nuclear news》 |2015年第12期|32-32|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号