...
首页> 外文期刊>Nuclear news >NNSA backs General Atomics selective gas extraction project
【24h】

NNSA backs General Atomics selective gas extraction project

机译:NNSA支持General Atomics选择性气体提取项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

With two construction permit applications for new molybde-num-99 production facilities already under review by the Nuclear Regulatory Commission staff, a joint venture of Sterigenics International subsidiary Nor-dion, the University of Missouri Research Reactor (MURR), and General Atomics (GA) hopes to start producing Mo-99 with less licensing effort-and perhaps sooner-than the other contenders. GA is receiving financial backing from the Department of Energy's National Nuclear Security Administration, even though the final production of Mo-99/technetium-99m generators for medical diagnostic purposes would be done by Nordion in Canada-perhaps not the ideal outcome for the campaign to restore the production of Mo-99/Tc-99m in the United States. Ever since an April 27 meeting with NRC staffers in which representatives of the Nordion group argued that the GA-developed process should require no more than an amendment to MURR's existing license, the staff has tried to pin down what the extra equipment would be, from a licensing standpoint. At one point, a staffer asked, "If it isn't an experiment, what is it?"
机译:核监管委员会的工作人员,Sterigenics International子公司Nor-dion的合资企业,密苏里大学研究堆(MURR)和General Atomics(GA)的合资企业已经在审查两个新的99号钼生产设施的建设许可证申请。 )希望以比其他竞争者更少的许可工作(也许更快)开始生产Mo-99。通用汽车公司正在获得能源部国家核安全局的资金支持,即使用于医疗诊断目的的Mo-99 / tech-99m发电机的最终生产将由加拿大的Nordion完成,这可能不是该运动的理想结果。在美国恢复Mo-99 / Tc-99m的生产。自从4月27日与NRC员工举行会议以来,北欧集团的代表认为通用航空制定的程序只需要对MURR的现有许可证进行修订,从那时起,员工就一直在努力确定多余的设备,从许可观点。有一次,一名工作人员问:“如果不是实验,那是什么?”

著录项

  • 来源
    《Nuclear news》 |2015年第12期|85-86|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号