...
首页> 外文期刊>Nuclear news >Preparing for the hard work ahead
【24h】

Preparing for the hard work ahead

机译:为未来的艰苦工作做准备

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Over a year has passed since the events at the Waste Isolation Pilot Plant (WIPP) put a temporary hold on operations at the plant, but as the world's only working deep geologic repository for transuranic waste, WIPP was very much a topic of conversation at WM Symposia's 2015 Waste Management Conference, held March 15-19 in Phoenix, Ariz. A number of conference sessions included discussions on what is known about what happened at WIPP, the plans to bring the plant back into service, and the lessons learned from the two incidents that shut it down. WIPP was also an important subject for the conference's international attendees, many of whom are actively working to build a deep geologic repository in their own countries.
机译:自废物隔离试点工厂(WIPP)的事件暂时搁置了工厂以来,已经过去了一年多,但是作为世界上唯一的超铀废物深层地质处置库,WIPP成为WM的一个话题3月15日至19日在亚利桑那州凤凰城举行的2015年废物管理研讨会,许多会议讨论了WIPP发生的情况,使该厂重新投入使用的计划以及从两次会议中汲取的教训关闭它的事件。 WIPP也是会议国际与会者的重要主题,其中许多人正在积极努力在自己的国家中建立一个深层的地质资料库。

著录项

  • 来源
    《Nuclear news》 |2015年第6期|54-57|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号