...
首页> 外文期刊>Nuclear news >NRC staff proposes doubling license terms for uranium recovery facilities
【24h】

NRC staff proposes doubling license terms for uranium recovery facilities

机译:NRC工作人员提议将铀回收设施的许可条款增加一倍

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Nuclear Regulatory Commission staff is proposing that the maximum term of licenses and license renewals for uranium recovery (UR) facilities be increased from 10 to 20 years. The staff presented its proposal to the commissioners in a policy issue paper dated August 29 and added to the ADAMS public document library (accession number ML17093A951) on September 15. "Extending the license term for UR facilities to 20 years would not change the health and safety requirements currently in licenses," the paper states. "A 20-year license would grant the same authorizations and have the same conditions as a 10-year license."
机译:核监管委员会的工作人员建议将铀回收(UR)设施的许可和续期的最长期限从10年增加到20年。工作人员在8月29日的政策问题文件中向专员提交了提案,并于9月15日添加到ADAMS公共文档库(登录号ML17093A951)中。“将UR设备的许可期限延长至20年不会改变健康状况,并且许可证中目前的安全要求。” “ 20年许可证将授予与10年许可证相同的授权,并具有相同的条件。”

著录项

  • 来源
    《Nuclear news》 |2017年第12期|41-43|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号