Taishan-I connected to grid

机译:台山-我并网

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Unit 1 of China's Taishan nuclear power plant, now the lead EPR project in the world, was connected to the grid on June 29 at 5:59 local time. Construction of the reactor began in 2009, with that of its sister plant, Taishan-2, starting in 2010. These two units were, respectively, the third and fourth EPR reactors to start construction (Olkiluoto-3 in Finland and Flamanville-3 in France were the first two, with construction beginning in 2005 and 2007, respectively). On April 10, following the completion of preparatory work and testing, China's Ministry of Ecology and Environment gave permission to load fuel in Unit 1, which commenced that same day, and first criticality was achieved on June 6. Following grid connection, the reactor started a period of power-raising and associated testing, which will culminate in steady-state operation at full power.
机译:中国泰山核电站的1号机组(现已成为全球领先的EPR项目)于当地时间6月29日5:59并网。该反应堆的建造始于2009年,其姊妹工厂Taishan-2的建造始于2010年。这两个装置分别是开始建造的第三和第四座EPR反应堆(芬兰的Olkiluoto-3和Flamanville-3)。法国是前两个国家,分别于2005年和2007年开始建设。在准备工作和测试完成后的4月10日,中国生态与环境部准许在当天开始的1号机组装载燃料,并于6月6日达到第一个临界点。经过一段时间的加电和相关测试,最终将达到全功率稳态工作。

著录项

  • 来源
    《Nuclear news》 |2018年第9期|39-43|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号