首页> 外文期刊>Nuclear Market Review >China Starts Construction of Reactor Using Hualong One Design
【24h】

China Starts Construction of Reactor Using Hualong One Design

机译:中国开始使用华龙一号设计建造反应堆

获取原文
获取原文并翻译 | 示例
           

摘要

China National Nuclear Corp. (CNNC) has been granted construction licenses for Units 1 and 2 of the Zhangzhou Nuclear Power Plant, in the country's eastern Fujian province, by the Ministry of Ecology and Environment. The units were originally planned to be based on Westinghouse's AP1000 design, but will now feature the domestically designed, thirdgeneration Hualong One PWR jointly designed by China General Nuclear Power Group and CNNC. CNNC noted that the project marks the official start of the "batch construction" of Hualong One. The Zhangzhou Plant will include six 1,000 MWe Hualong One units.
机译:中国国家核工业公司(CNNC)已获得生态与环境部授予的福建省东部漳州核电站1号和2号机组的建设许可证。这些机组原本计划以西屋公司的AP1000设计为基础,但现在将采用由中国通用核电集团和CNNC联合设计的国产第三代华龙一号压水堆。中核集团指出,该项目标志着华龙一号“批量建设”的正式开始。漳州工厂将包括六个1,000 MWe华龙一号机组。

著录项

  • 来源
    《Nuclear Market Review》 |2019年第18期|6-7|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号