首页> 外文期刊>Nuclear Engineering International >New vessel heads for Beznau
【24h】

New vessel heads for Beznau

机译:贝兹瑙的新船头

获取原文
获取原文并翻译 | 示例
       

摘要

Nordostschweizerischen Kraftwerke AG (NOK) is to replace the vessel heads at both reactors at its Beznau power plant in Switzerland. The CHF100 million ($86 million) investment will also include two control rod drives at the plant. Installation of the new components is scheduled for 2013.rnThe vessel head replacement is being carried out as a preventa-tive measure to ensure continued operation of the two 365MWe Westinghouse PWRs. No prob-rnlems that would necessitate repairs or replacement have been found in the two reactors, which have been operating for around 40 years, but NOK has decided to carry out the replacement based on global operating experience in about 80 similar installations indicating that frequent, time-consuming inspections and partial repairs could be required as the plants grow older.
机译:Nordostschweizerischen Kraftwerke AG(NOK)将更换其位于瑞士Beznau电厂的两个反应堆的船头。 1亿瑞士法郎(8600万美元)的投资还将包括该工厂的两个控制杆驱动器。新组件的安装计划于2013年进行。为了防止两个365MWe西屋压水堆继续运行,正在采取更换船头的措施。在运行了约40年的两个反应堆中,没有发现需要维修或更换的问题,但NOK决定根据全球运行经验在约80个类似的装置中进行更换,这表明,随着工厂的老化,可能需要进行耗时的检查和部分维修。

著录项

  • 来源
    《Nuclear Engineering International》 |2009年第655期|11|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:49:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号