首页> 外文期刊>Nuclear Engineering International >Plant area monitoring at Krsko
【24h】

Plant area monitoring at Krsko

机译:Krsko的工厂面积监控

获取原文
获取原文并翻译 | 示例
       

摘要

Post-Fukushima upgrades at Krsko in Slovenia are being implemented in accordance with the requirements of the national regulator and the plant owners. The first phase, including a passive containment vent filtering system and hydrogen recombiners, a new emergency diesel generator, and a protected store of mobile emergency equipment, is already completed. The next phase in 2014-2018 will cover the emergency control room, a new technical support centre, reconstruction of an operation support centre, alternate cooling features for removing decay heat and on-site flood protection.
机译:根据国家监管机构和工厂所有者的要求,正在斯洛文尼亚Krsko实施福岛事后升级。第一阶段已经完成,包括无源安全壳排气过滤系统和氢气重组器,新的应急柴油发电机以及移动应急设备的受保护仓库。 2014-2018年的下一阶段将包括应急控制室,新的技术支持中心,运营支持中心的重建,用于消除衰变热和现场防洪的替代冷却功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号