首页> 外文期刊>Nuclear future >Assessment process on track for potential new nuclear units
【24h】

Assessment process on track for potential new nuclear units

机译:评估过程有望进入新的潜在核单位

获取原文
获取原文并翻译 | 示例
           

摘要

The generic design assessment (GDA) process which could pave the way for construction of a new generation of nuclear power plants in the UK is on track for completion within the next two years. Two reactor designs are under assessment as part of the GDA process in the UK. They are: Areva and EDF's European Pressurised Water Reactor and Westinghouse Electric Company's AP1000. Progress and related information about the process was published on 27th July in a joint report, covering the period April to June 2009, by the UK's Health & Safety Executive (HSE) and the Environment Agency.
机译:通用设计评估(GDA)流程可为英国新一代核电站的建设铺平道路,有望在未来两年内完成。作为英国GDA程序的一部分,正在评估两种反应堆设计。它们是:阿海珐和EDF的欧洲压水堆以及西屋电气公司的AP1000。英国卫生与安全经理(HSE)和环境署于7月27日在一份联合报告中发布了有关该过程的进展和相关信息,涵盖了2009年4月至6月。

著录项

  • 来源
    《Nuclear future》 |2009年第5期|234-234|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号