...
首页> 外文期刊>New civil engineer >Scottish bridge hit by connector test delays
【24h】

Scottish bridge hit by connector test delays

机译:苏格兰桥梁受到连接器测试延迟的打击

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Clyde Arc contractor Nuttall was this week facing delays to the construction of Forthside footbridge in Stirling, as testing on the Macalloy connections has slowed progress. Components on the Forthside bridge are standard Macalloy connectors, unlike the bespoke products which failed on Glasgow's Clyde Arc. On the Arc, one bespoke connector suffered a clean break across its connection lugs and another was found to have a crack in the same place (NCE 31 January). A Nuttall spokesman confirmed that components for the Forthside railway footbridge which spans seven rail tracks, were being tested.
机译:Clyde Arc承包商Nuttall本周在斯特林(Stirling)的Forthside人行天桥建设方面面临延误,因为Macalloy连接的测试减缓了进度。 Forthside桥上的组件是标准的Macalloy连接器,这与在格拉斯哥的Clyde Arc上失败的定制产品不同。在Arc上,一个定制的连接器的连接接线片干净断裂,另一个在同一位置被发现有裂缝(NCE,1月31日)。 Nuttall发言人证实,横跨7条轨道的Forthside铁路人行天桥的组件正在测试中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号