...
首页> 外文期刊>New civil engineer >How safe was the River Rea pipe lifting operation?
【24h】

How safe was the River Rea pipe lifting operation?

机译:River Rea管道吊运的安全性如何?

获取原文
获取原文并翻译 | 示例
           

摘要

I'm sure I won't be the only civil engineer with a concern for site safety to be disturbed by the dangers to which the construction worker is exposed as seen in the photograph (see above) of the use of Weholite at the River Rea project (NCE last week).rnIt's clear that the man attempting to guide the very large load from his precarious footing on the top of the curved and gravel-strewn top surface of the 3.5m diameter plastic pipe has no safety equipment or other means of preventing a potentially serious fall.
机译:我敢肯定,我不会是唯一一个担心场地安全的土木工程师,因为在Rea河上使用Weholite的照片(见上图)显示,建筑工人所面临的危险使他们不安这个项目(上周的NCE)。很明显,该男子试图从3.5 m直径塑料管弯曲和砾石铺砌的顶面顶部不稳定的脚底引导巨大的负荷,没有任何安全设备或其他方法防止潜在的严重跌倒。

著录项

  • 来源
    《New civil engineer》 |2010年第20期|15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号