...
首页> 外文期刊>New civil engineer >How to forge a winning crew
【24h】

How to forge a winning crew

机译:如何打造一支优秀的船员

获取原文
获取原文并翻译 | 示例
           

摘要

How do you turn staff from four separate contractors into a team? That was the important job facing Interlink project director David Welsh if he wanted to bring the huge, eye-catching M74 scheme in early and at a profit. Fortunately, Welsh is highly experienced at pulling joint ventures together. He is a senior project director at Interlink partner Sir Robert McAlpine, and was called in to the post on the M74 because he had a vast amount of knowledge to share from his experience of being project manager or project director on eight major JV schemes around the UK. These included most of Scotland's recent major road projects: theM77 southern orbital, the M6/M74, Luss bypass at Loch Lomond, the M74 Abington to Elvanfoot and the M8/M9 connection at Newbridge.
机译:您如何将来自四个独立承包商的员工变成一个团队?如果Interlink项目总监David Welsh希望早日带来盈利的庞大M74计划,那将是他面临的重要工作。幸运的是,威尔士在组建合资企业方面经验丰富。他是Interlink合作伙伴Robert McAlpine爵士的高级项目总监,之所以被邀请担任M74职位,是因为他拥有丰富的知识,可以从担任八项主要合资计划的项目经理或项目总监的经验中分享经验。英国。这些项目包括苏格兰最近进行的大部分重大公路项目:M77南部轨道,M6 / M74,洛蒙德湖旁的Luss绕行,M74阿宾顿至Elvanfoot的连接以及新桥的M8 / M9连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号