...
首页> 外文期刊>New civil engineer >Atkins drawn into dispute over Cambridgeshire busway
【24h】

Atkins drawn into dispute over Cambridgeshire busway

机译:阿特金斯因剑桥郡公交专用道而陷入争议

获取原文
获取原文并翻译 | 示例

摘要

Contractor Bam Nuttall this week refuted a £55 M claim made against it by Cambridgeshire County Council for delays to its guided busway scheme and issued its own £ 43 M counterclaim. Documents filed last week at the Technology and Construction Court and seen by NCE show that Bam Nuttall blames consultant Atkins, the council's project manager, for much of the delay to the 26km busway. They say that Atkins "failed to act independently and fairly and/ or to act as stated in the contract in the spirit of mutual trust and co-operation".
机译:承包商本·努塔尔(Bam Nuttall)本周反驳了剑桥郡县议会针对其引导式公交专用道计划的延误提出的5500万英镑的索赔,并发布了自己的4300万英镑反索赔。 NCE看到,上周向技术和建筑法院提交的文件显示,班姆·努塔尔(Bam Nuttall)将这条26公里公交专用道的大部分延误归咎于理事会项目经理顾问阿特金斯(Atkins)。他们说,阿特金斯“没有本着相互信任与合作的精神独立和公平地行动和/或没有按照合同所述行事”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号