首页> 外文期刊>New civil engineer >Is the nuclear supply chain up to the job?
【24h】

Is the nuclear supply chain up to the job?

机译:核供应链能否胜任?

获取原文
获取原文并翻译 | 示例
           

摘要

The last Magnox reactor is due to be switched off in December, nearly 60 years after Britain's first nuclear power station, Calder Hall in Cumbria, began generating. As the Magnox reactors have gradually been retired, so too have thousands of people skilled in building and running nuclear power plants. With crucial skills in short supply, the challenge of building the country's first new nuclear power station in a generation is daunting. The Chinese/French consortium funding the new plant at Hinkley Point in Somerset says that at least 60% of the supply chain used in its construction will be British.
机译:在英国第一个核电站坎布里亚郡的卡尔德·霍尔(Calder Hall)开始发电近60年之后,最后一个Magnox反应堆将于12月关闭。随着Magnox反应堆逐渐退役,成千上万的建造和运行核电站的技术人员也纷纷退休。由于短缺的关键技能,建造该国一代内第一个新核电站的挑战是艰巨的。由中国/法国财团为萨默塞特郡欣克利角新工厂的建设提供资金,称其建设所用供应链中至少有60%将是英国人。

著录项

  • 来源
    《New civil engineer》 |2014年第27期|15-15|共1页
  • 作者

    Mike Piggot;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号