...
首页> 外文期刊>New civil engineer >Crossrail's rampant cost increases laid bare
【24h】

Crossrail's rampant cost increases laid bare

机译:Crossrail猖cost的成本增长暴露无遗

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Enormous cost increases on every single one of Crossrail's seven central London station contracts have been revealed. Cost hikes of up to 450% of the original target cost have also been reported on tunnelling contracts as well as significant increases in route-wide civil engineering and systems integration contracts. In total, public spending watchdog the National Audit Office (NAO) has revealed that costs on "36 main works contracts on the central section have increased, including contracts for tunnelling, civil engineering, station construction and fit-out, and implementing the systems required to operate the railway and stations".
机译:Crossrail的七个伦敦市中心车站合同中的每一个合同都增加了巨大的成本。据报道,隧道合同的成本上涨了最初目标成本的450%,全路线的土木工程和系统集成合同也大幅增加。总体而言,公共支出监管机构国家审计署(NAO)透露,“ 36个中部主要工程合同的成本已经增加,包括隧道,土木工程,车站建设和装修以及实施系统的合同运营铁路和车站所需的”。

著录项

  • 来源
    《New civil engineer》 |2019年第6期|11-12|共2页
  • 作者

    ROB HORGAN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号