...
首页> 外文期刊>Naval Research Logistics >Integrated Production Scheduling and Preventive Maintenance Planning for a Single Machine Under a Cumulative Damage Failure Process
【24h】

Integrated Production Scheduling and Preventive Maintenance Planning for a Single Machine Under a Cumulative Damage Failure Process

机译:累积损坏故障过程中单台机器的集成生产计划和预防性维护计划

获取原文
获取原文并翻译 | 示例
           

摘要

This paper finds the optimal integrated production schedule and preventive maintenance plan for a single machine exposed under a cumulative damage process, and investigates how the optimal preventive maintenance plan interacts with the optimal production schedule. The goal is to minimize the total tardiness. The optimal policy possesses the following properties: Under arbitrary maintenance plan when jobs have common processing time, and different due dates, the optimal production schedule is to order the jobs by earliest due date first rule; and when jobs have common due date and different processing times, the optimal production schedule is shortest processing time first. The optimal maintenance plan is of control limit type under any arbitrary production schedule when machine is exposed under a cumulative damage failure process. Numerical studies on the optimal maintenance control limit of the maintenance plan indicate that as the number of jobs to be scheduled increases, the effect of jobs due dates on the optimal maintenance control limit diminishes.
机译:本文为暴露在累积损坏过程中的单台机器找到了最佳的综合生产计划和预防性维护计划,并研究了最佳预防性维护计划如何与最佳生产计划相互影响。目的是使总拖延最小化。该最优策略具有以下特点:在任意的维修计划下,当作业具有相同的处理时间,到期日不同时,最优的生产计划是按照最早到期日的先后顺序来订购作业;当工作有相同的到期日和不同的处理时间时,最佳的生产计划首先是最短的处理时间。当机器在累积损坏故障过程中暴露时,最佳维护计划是在任何生产计划下的控制极限类型。对维护计划的最佳维护控制限制进行的数值研究表明,随着要计划的作业数量的增加,作业到期日对最佳维护控制限制的影响将减小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号