首页> 外文期刊>Naval engineers journal >Making Risk Management Work
【24h】

Making Risk Management Work

机译:制定风险管理工作

获取原文
获取原文并翻译 | 示例
       

摘要

In the department of defense, risk management typically focuses on precisely defining a risk statement, evaluating its probability of occurrence and severity of consequence, and identifying and planning mitigation steps. This simplistic approach to risk management often becomes difficult to implement in a way that provides useful insight to the Program Manager. This paper will discuss the shortfalls of this approach to risk and will discuss issues such as the importance of understanding the impact of time (when a risk is realized) on the consequences, differentiating risks based on knowledge gaps from those on uncertainties, effective risk mitigation planning, incorporating the cost of risk in program cost estimates, the issues associated rolling up multiple lower level risks into higher level risks, and the relationship between risk management and set-based design.
机译:在国防部,风险管理通常专注于精确定义风险陈述,评估其发生的概率和后果的严重程度,以及识别和规划缓解步骤。这种简单的风险管理方法通常难以实现对程序管理器提供有用的洞察的方式实现。本文将讨论这种风险方法的不足,并将讨论理解时间的影响(当意识到风险时)的重要性,使基于不确定性的知识差距的风险区分风险,有效风险减缓规划,纳入计划成本估计的风险成本,将问题汇总升高的较低水平风险以及风险管理与基于集的设计之间的关系。

著录项

  • 来源
    《Naval engineers journal》 |2018年第3期|77-85|共9页
  • 作者

    Doerry Norbert;

  • 作者单位

    Naval Sea Syst Command Technol Off Washington Navy Yard DC 20376 USA|US Navy Washington DC USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 21:45:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号