...
首页> 外文期刊>Modern Railways >SCOTTISH ENHANCEMENTS ADVICE FOR CP6
【24h】

SCOTTISH ENHANCEMENTS ADVICE FOR CP6

机译:CP6的苏格兰增强建议

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

THE RAIL Delivery Group, on behalf of the industry, has provided advice to the Scottish Government on investment plans north of the border during Control Period 6 (2019-24) in a document entitled 'Scotland's rail infrastructure'. Electrification is suggested for the lines to East Kilbride/ Barrhead, Kilmarnock/Barassie and the Maryhill line. Grade separation at Greenhill Junction (west of Falkirk), enhancements in the Carstairs area and on the Dunblane to Perth corridor also feature, along with four-tracking of the East Coast main line between Prestonpans and Drem. Some of these schemes are proposed for CP6 and others for CP7 (2024-29).
机译:铁路运输集团代表行业,在题为“苏格兰的铁路基础设施”的文件中,在控制期6(2019-24)期间,就边界以北的投资计划向苏格兰政府提供了建议。建议对East Kilbride / Barrhead,Kilmarnock / Barassie和Maryhill线进行电气化。 Greenhill交汇处(福尔柯克以西)的坡度分离,Carstairs地区以及Dunblane至Perth走廊的坡度增强,以及在Prestonpans和Drem之间的东海岸干线的四轨跟踪。这些方案中有一些是针对CP6提出的,其他是针对CP7(2024-29)的。

著录项

  • 来源
    《Modern Railways》 |2017年第3期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号