...
首页> 外文期刊>Modern Railways >SHEFFIELD TRAM-TRAIN SETS THE STANDARD
【24h】

SHEFFIELD TRAM-TRAIN SETS THE STANDARD

机译:谢菲尔德电车火车设置标准

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

For some time, it seemed the Sheffield tram-train would never quite become a reality. On 25 October last year it finally did, with the launch of services over the Supertram network from Sheffield and onto Network Rail infrastructure to a terminus at Rotherham Parkgate. After the idea of a bi-mode pilot on the Penistone line between Sheffield and Huddersfield was dropped, the key aim was seen as demonstrating it would be possible to link light and heavy rail, with the Rotherham route chosen at least partly because of the close proximity of both networks east of Meadowhall. The new route would also meet local political aspirations of linking Rotherham into the Supertram network at a much more modest cost than an on-street link, which had been ruled out as too costly.
机译:有一段时间,它似乎谢菲尔德电车火车永远不会变得一切成为现实。去年10月25日,它终于达到了从谢菲尔德的超级坦网络和网络轨道基础设施的服务,在Rotherham Parkgate的终结。在谢菲尔德和哈德斯菲尔德之间的竹子线路上的双模飞行员的想法之后被丢弃之后,关键目标被视为展示,可以将光线和重型导轨连接,其中rotherham路线至少部分地选择,因为关闭在Meadowhall以东的两个网络接近。新的路线还将满足当地的政治愿望,以比一条街头链接更适中地将rotherham与超级网络连接联系到超级特征,这被排除了太昂贵。

著录项

  • 来源
    《Modern Railways》 |2019年第7期|62-63|共2页
  • 作者

    TONY MILES;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号