首页> 外文期刊>Modern Railways >MARSTON VALE '230s' STRUGGLE
【24h】

MARSTON VALE '230s' STRUGGLE

机译:MARSTON VALE'230s'挣扎

获取原文
获取原文并翻译 | 示例
           

摘要

PASSENGERS ON the Marston Vale line between Bletchley and Bedford, who have endured significant disruption to their journeys, were invited to a 'Meet the Manager' session on board one of the troublesome Class 230 DMUs on 12 September to hear about plans to improve the service. Since their introduction on 23 April the Vivarail sets have struggled.Two of the three sets are required to operate the timetable, but many days have seen one or even no sets operational and buses regularly drafted in as cover. Monthly reliability tables have shown the sets delivering less than 500 miles per technical failure with no indication of improvement (Table 1).
机译:9月12日,布莱奇利和贝德福德之间的马斯顿维尔路线上的乘客经历了重大行程中断,他们被邀请参加了麻烦重重的230级DMU之一上的“与经理会面”会议,以了解改善服务的计划。自4月23日推出以来,Vivarail装置一直在苦苦挣扎,需要三套装置中的两套来运行时间表,但许多天来甚至没有一套装置可以运行,并且定期起草了公共汽车。每月可靠性表显示,每套技术故障所产生的故障少于500英里,没有改善的迹象(表1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号