首页> 外文期刊>Modern Railways >MORE ELECTRIFICATION MILESTONES: FIRST EMU ON CHASE LINE AS SHOTTS FORMALLY COMPLETED
【24h】

MORE ELECTRIFICATION MILESTONES: FIRST EMU ON CHASE LINE AS SHOTTS FORMALLY COMPLETED

机译:更多的电子化里程碑:随着正式完成拍摄,第一个动车组在追逐路线上

获取原文
获取原文并翻译 | 示例
           

摘要

THE FIRST electric train operated through to Rugeley on the Chase line on 7 April, ahead of the start of electric passenger services with the May timetable change. The section north of Walsall to Rugeley Trent Valley has been electrified by Network Rail in a project costing more than £100 million, featuring the erection of wires on 51 km of track and complete reconstruction of six road bridges. West Midlands Trains' No 323217 was the first electric train on the newly-wired stretch, departing Birmingham New Street at 16.45 and reaching Rugeley Trent Valley at 17.47, before returning at 17.52. A similar test using a Class 350 EMU was due to take place on 14 April, ensuring both types of train can operate satisfactorily on the line.
机译:4月7日,随着5月时刻表的开始,在电动客运服务开始之前,第一条电动火车沿大通线通向Rugeley。沃尔索尔(Wallsall)以北至鲁格利特伦河谷(Rugeley Trent Valley)的路段已由Network Rail电气化,该项目耗资超过1亿英镑,其特征是在51公里的轨道上架设电线,并完全重建六座路桥。西米德兰兹火车(West Midlands Trains)的323217号是新线路上的第一列电动火车,于16.45离开伯明翰新街,并于17.47到达Rugeley Trent谷,然后返回17.52。使用350级动车组的类似测试将于4月14日进行,以确保两种类型的列车都能在线路上令人满意地运行。

著录项

  • 来源
    《Modern Railways》 |2019年第5期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号