首页> 外文期刊>MIS quarterly >Knowledge Integration and Information Technology Project Performance
【24h】

Knowledge Integration and Information Technology Project Performance

机译:知识整合与信息技术项目绩效

获取原文
获取原文并翻译 | 示例
       

摘要

Successful product and process design depends on management's ability to integrate fragmented pockets of specialized knowledge. This integrative capability has important implications for large-scale information technology projects. This article examines the relationship between timely project completion and two dimensions of management's integrative capability: access to external knowledge and internal knowledge integration. Measures of these two dimensions are used to predict on-time project completion, where completion is a function of the duration of TT-related project delays. In a longitudinal study of 74 enterprise application integration projects in the medical sector, integrative capability was measured from the point of view of the CIO and a facility IT manager. Accounting for several project controls, our Cox regression results indicate both integrative dimensions significantly mitigate the duration of IT-related project delays, thus promoting timely project completion. The analysis also reveals the importance of taking management structure into consideration when studying IT phenomena in networked organizations.
机译:成功的产品和流程设计取决于管理层整合零散的专业知识的能力。这种集成能力对大型信息技术项目具有重要意义。本文研究了及时的项目完成与管理层的整合能力的两个维度之间的关系:获取外部知识和内部知识整合。这两个维度的度量用于预测项目按时完成,其中完成是与TT相关的项目延迟时间的函数。在对医疗领域74个企业应用程序集成项目的纵向研究中,从CIO和设施IT经理的角度衡量了集成能力。考虑到几个项目控制,我们的Cox回归结果表明,这两个综合维度都显着减轻了与IT相关的项目延迟的时间,从而促进了项目的及时完成。分析还揭示了在研究网络组织中的IT现象时考虑管理结构的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号