If anything, the current naval development situation in Malaysia clearly proves how planned devel-opment and naval procurement can go off the rails for a whole variety of reasons. One clear example is the MAHARAJA LELA Littoral Combat Ship (LCS) programme, based on Naval Group's GOWIND design. A 2013 contract for six 3,1OOt vessels called for delivery in 2018 and service entry for the first vessel in 2019, with the others following on a six-month drum-beat. Currently, the first ship is now expected to be delivered only by the end of 2019, assuming no further delays occur. The delay can be traced back to the Malaysian government's decision to have all six ships built in-country. Naval Group had offered to build the first vessel in France, with Malaysia to build the remaining five, which would have resulted in Naval Group, not Malaysia, shouldering the first-of-class construction risks.
机译:如果有的话,马来西亚目前的海军发展状况清楚地证明了计划的发展和海军采购由于各种原因如何脱离轨道。一个明显的例子是基于海军集团GOWIND设计的MAHARAJA LELA沿海战斗舰(LCS)计划。 2013年的6艘3,100吨船的合同要求于2018年交付,并于2019年为第一艘船提供服务,其余6艘船则进行了为期6个月的敲击。目前,假设没有进一步的延误,现在预计第一艘船将只在2019年底交付。延误可以追溯到马来西亚政府决定在国内建造全部六艘船的决定。海军集团曾提议在法国建造第一艘船,而马来西亚将建造其余五艘,这将导致海军集团(而不是马来西亚)承担一流的建造风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号