Disagreements between engineers, owners, and contractors on construction projects are common and can arise at any stage of a project. The disagreement may relate to a change in design, a delay, an unexpected subsurface condition, or any other of the numerous problems that might arise on a project. Oftentimes, these problems cause a contractor to make claims against the owner to recover extra costs incurred by the contractor to overcome the problem. In many cases, owners seek to hold the design engineer responsible for the financial consequences of the problem, resulting in a formalized dispute between the owner and the engineer that the parties are unable to resolve through their own negotiation efforts. Payment disputes may also become formalized where the owner for some reason is not satisfied with the engineer's work.
机译:工程师,业主和承包商在建筑项目上的分歧很普遍,并且可能在项目的任何阶段出现。分歧可能与设计变更,延迟,意外的地下状况或项目中可能出现的众多其他问题有关。通常,这些问题会导致承包商向业主索赔,以弥补承包商为解决该问题而招致的额外费用。在许多情况下,所有者寻求使设计工程师对问题的财务后果负责,从而导致所有者与工程师之间的正式争议,即各方无法通过自己的谈判努力解决。如果所有者出于某种原因对工程师的工作不满意,则付款纠纷也可能正式化。

著录项

  • 来源
    《Midwest engineer》 |2004年第4期|p.11-12|共2页
  • 作者

    MARK R. BECKER;

  • 作者单位

    Construction Law Group of the Chicago office of the Schiff Hardin LLP law firm;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

  • 入库时间 2022-08-17 23:10:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号