...
首页> 外文期刊>Metal bulletin >Goa iron ore freight strike ends, Orissa mines restarting
【24h】

Goa iron ore freight strike ends, Orissa mines restarting

机译:果阿铁矿石货运罢工结束,奥里萨邦矿重新开始

获取原文
获取原文并翻译 | 示例

摘要

Iron ore miners in the southwestern Indian state of Goa are returningto normal operations after defusing a strike by transportation workers began in earlyJanuary. The transportation workers have started lifting ore and carrying it to the river loading ports, said S. Srid har, executive director at Goa's mineral exporters' association. "The issue has been sorted out. Miners have individually negotiated with transporters, transport charges have been increased from an average of Rs4.50 (10 US cents) per tonne to about Rs7-8 pertonne depending on certain factors," Sridhartold MB. Transportation contractors had gone on strike to ask miners to increase the truck freight rate to Rs11.50 pertonne per km from Rs4.50.
机译:印度西南部果阿州的铁矿石开采商在1月初开始缓解运输工人的罢工后,正在恢复正常运营。果阿矿产出口商协会执行董事S. Srid har说,运输工人已经开始将矿石​​运到河上装货港。 Sridhartold MB说:“问题已经得到解决。矿工已经与运输商单独谈判,运输费用已从每吨平均4.5卢比(10美分)提高到每吨7至8卢比,具体取决于某些因素。”运输承包商罢工,要求矿工将卡车运费从每公里4.50卢比提高到每公里11.50卢比。

著录项

  • 来源
    《Metal bulletin》 |2011年第9185期|p.16|共1页
  • 作者

    URESH NAIR;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号