首页> 外文期刊>Marine pollution bulletin >The EU directive on port reception facilities for ship-generated waste and cargo residues: current availability of facilities in the North Sea
【24h】

The EU directive on port reception facilities for ship-generated waste and cargo residues: current availability of facilities in the North Sea

机译:欧盟关于船舶产生的废物和货物残渣的港口接收设施的指令:北海设施的当前可用性

获取原文
获取原文并翻译 | 示例
           

摘要

The aim of this paper is to evaluate the current availability of port reception facilities within the North Sea area. The evaluation is based primarily on original survey data from the summer of 2001, supplemented by existing information from surveys conducted by the International Maritime Organization. The EU Directive on port reception facilities for ship-generated waste etc. (Directive 2000/ 59/EC) requires that all ports provide facilities to meet the needs of those vessels normally calling in at them. In order for the Directive to be implemented effectively, the physical availability of such facilities is vital. This paper audits the wide range of port types within the region and also outlines the wide range of vessel types using these ports, and their requirements for a range of facilities. On the basis of this analysis, conclusions are drawn about the extent to which the provision requirement of the Directive is already being met.
机译:本文的目的是评估北海区域内港口接收设施的当前可用性。评估主要基于2001年夏季的原始调查数据,并辅以国际海事组织进行的调查的现有信息。欧盟关于船上产生的废物等港口接收设施的指令(指令2000/59 / EC)要求所有港口都提供设施,以满足通常停靠它们的船舶的需求。为了有效地执行该指令,此类设施的物理可用性至关重要。本文审核了该区域内的各种港口类型,并概述了使用这些港口的各种船只类型,以及它们对一系列设施的要求。在此分析的基础上,得出有关该指令的规定要求已得到满足的程度的结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号