首页> 外文期刊>Marine policy >How robust is the environmental impact assessment process in South Australia? Behind the scenes of the Adelaide seawater desalination project
【24h】

How robust is the environmental impact assessment process in South Australia? Behind the scenes of the Adelaide seawater desalination project

机译:南澳大利亚州的环境影响评估程序有多强大?阿德莱德海水淡化项目的幕后花絮

获取原文
获取原文并翻译 | 示例
           

摘要

This work tests the robustness of policies and procedures designed to protect South Australia's marine environment through a case study of the Adelaide Desalination Plant-the most expensive (~A$1.8 billion) infrastructure project in South Australia's history. Although this project has been subject to an Environmental Impact Assessment (EIA)-the highest level of assessment in Australia-on inspection it appears that the current operating licence for the desalination brine discharge breaches Government approval conditions and ignores the collective expert scientific advice of the project's Environmental Impact Statement (EIS). Hence, the EIA process in South Australia for this project is flawed. Improvements could be made to the South Australian system by including the requirements for operating licences as an integral part of the EIA.
机译:这项工作通过对阿德莱德海水淡化厂的案例研究来检验旨在保护南澳大利亚州海洋环境的政策和程序的稳健性,这是南澳大利亚州历史上最昂贵(约18亿澳元)的基础设施项目。尽管该项目已经接受了环境影响评估(EIA)的检查,这是澳大利亚最高的检查水平,但目前的淡化盐水排放操作许可证似乎违反了政府的批准条件,并且无视该专家的集体科学建议。项目的环境影响声明(EIS)。因此,该项目在南澳大利亚州的EIA程序存在缺陷。通过将运营许可要求纳入EIA,可以对南澳大利亚州系统进行改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号