Western states are on target to complete their SIPs by the July 2021 deadline. The western states’ regional haze analysis for the second planning period has stark differences to the analysis completed in the first planning period. EGU emissions have substantially declined due to retirements and controls at coal-fired power plants throughout the West and will continue to decline through the second planning period. Oil and gas sector emissions have increased and the quantitative representation of these emissions in the western regional haze modeling has improved due to the iterative work undertaken in the west to understand these emissions over the past 15 years.
机译:西方国家的目标是在2021年7月的截止日期之前完成其SIP。西部各州在第二个计划期间的区域雾度分析与在第一个计划期间完成的分析存在明显差异。由于整个西部燃煤电厂的停产和控制,EGU排放量已大大减少,并且在第二个规划期内将继续下降。石油和天然气部门的排放量有所增加,并且由于过去15年间在西部开展的迭代工作以了解这些排放量,因此在西部区域霾模型中这些排放量的定量表示有所改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号