首页> 外文期刊>Tramways & Urban Transit >GOLD COAST LIGHT RAIL: QUEENSLAND'S FIRST LRT PROJECT
【24h】

GOLD COAST LIGHT RAIL: QUEENSLAND'S FIRST LRT PROJECT

机译:黄金海岸轻轨:昆士兰州的第一个轻轨项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Gold Coast is one of Australia's fastest growing cities, and the mounting population is causing increasing congestion on our local road network with travel times in Southport, Surfers Paradise and Broadbeach expected to increase by 30% by 2016 compared with 2006 figures. As there are no new major roads planned for the coastal corridor, the introduction of a sustainable public transport network is vital to keep the city moving. The idea for an enhanced public transport system for the Gold Coast is not new. Proposals for rapid transit were developed as part of the Gold Coast City Council's Transport Plan released in 1998, with the aim of reducing traffic congestion and helping to meet the Government's target of 12% of journeys to use public transport. Prior to the project, only 3.1% of journeys in the region are by public transport. Further to this, the environmental benefits of the first phase are anticipated to reduce local greenhouse gas emissions by 114 000 tonnes over the first decade of operation as well as enabling the creation of around 6300 direct and indirect jobs.
机译:黄金海岸是澳大利亚增长最快的城市之一,不断增长的人口正在使我们的本地道路网络日益拥挤,预计到2016年,Southport,Surfers Paradise和Broadbeach的旅行时间将比2006年增加30%。由于没有为沿海走廊规划新的主要道路,因此引入可持续的公共交通网络对于保持城市的运转至关重要。黄金海岸增强公共交通系统的想法并不新鲜。作为1998年发布的黄金海岸市议会交通计划的一部分,制定了快速交通建议,目的是减少交通拥堵,并帮助实现政府设定的12%的公共交通出行目标。在该项目之前,该地区只有3.1%的旅程是乘坐公共交通工具。除此之外,在运营的第一个十年中,预计第一阶段的环境效益将使当地的温室气体排放量减少11.4万吨,并创造大约6300个直接和间接就业机会。

著录项

  • 来源
    《Tramways & Urban Transit》 |2013年第911期|467-472|共6页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号