...
【24h】

MEXICO

机译:墨西哥

获取原文
获取原文并翻译 | 示例
           

摘要

The Mexican government has announced that it has begun the bidding process for the leasing of capacity on the fiber network of state-owned power company Comision Federal de Electricidad (CFE).rnUnder plans announced in May 2009, the state will auction off access to two unused portions of CFE's fiber-optic network covering approximately 20,000km for a 20-year period; the fiber strands will be divided into three geographic regions: Mexico's Pacific coast, the center of the country, and along the Gulf Coast. Mexico's communications and transport minister, Juan Molinar, in announcing the start of the auction process, also revealed that the combined minimum bid for the lines is MXN858.6 million (US$66.4 million). The winning bidders will be announced on June 9 2010, and it is expected that commercial operations of the fiber infrastructure will begin with 18 months of the end of the auction.
机译:墨西哥政府宣布已开始竞标国有电力公司Comision Federal de Electricidad(CFE)光纤网络的容量租赁。根据2009年5月宣布的计划,墨西哥州将拍卖两座CFE光纤网络的未使用部分覆盖20年的约20,000 km;纤维束将分为三个地理区域:墨西哥的太平洋海岸,该国中部和墨西哥湾沿岸。墨西哥通讯和运输部长胡安·莫利纳尔(Juan Molinar)在宣布拍卖程序开始时,还透露,这条铁路线的最低总出价为8.586亿墨西哥比索(合6640万美元)。中标者将于2010年6月9日宣布,预计光纤基础设施的商业运营将在拍卖结束后的18个月内开始。

著录项

  • 来源
    《Latin America Telecom》 |2010年第2期|10-13|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号