首页> 外文期刊>Landscape architecture Australia >THE ELICIT YIELD ANEW PROJECT: RECALIBRATING RECOUPLING MORWELL
【24h】

THE ELICIT YIELD ANEW PROJECT: RECALIBRATING RECOUPLING MORWELL

机译:合法收益的新项目:重新调整莫威尔的重新平衡

获取原文
获取原文并翻译 | 示例
       

摘要

This project aims to address the complex systemic vulnerabilities intrinsic to industrial decline through strategic intervention and a process of decentralized decision-making. Its goal is the reclamation of disused components of an operational mining landscape. A subversion of existing power relationships underpins the work, at the level of both designer/ stakeholder interactions and design propositions for the Hazelwood lignite mine in Morwell, Victoria. An understanding of physical and abstract systems governing the site was pursued through an open participatory process, empowering stakeholders at various phases to have critical and generative input. Propositions range from the infrastructural to the programmatic to the regulatory, and champion a whole-systems approach to the radical adjustments inherent in industrial and economic shifts of this scale.
机译:该项目旨在通过战略干预和分散决策过程来解决工业衰退固有的复杂系统漏洞。其目标是开垦可操作的采矿环境中废弃的组件。在设计师/利益相关者互动和维多利亚州莫韦尔的黑泽伍德褐煤矿的设计主张的层面上,颠覆现有权力关系的工作成为了工作的基础。通过开放的参与过程来了解对管理该站点的物理和抽象系统的了解,使各个阶段的利益相关者都能够获得关键和生成性的投入。提议的范围从基础结构到程序性再到法规性,都拥护一种整体系统的方法来应对这种规模的工业和经济转变所固有的根本性调整。

著录项

  • 来源
    《Landscape architecture Australia》 |2015年第145期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号