...
首页> 外文期刊>Land and water >Carson City Fwy Phase IB: A Practical & Aesthetic Approach to Erosion Control
【24h】

Carson City Fwy Phase IB: A Practical & Aesthetic Approach to Erosion Control

机译:Carson City Fwy Phase IN:实用且美观的侵蚀控制方法

获取原文
获取原文并翻译 | 示例

摘要

Because Northern Nevada is one of the fastest growing regions in the country, there is a large amount of traffic and congestion being brought to the State Capitol of Carson City and Highway 395, the main thoroughfare through Carson City. For these reasons, the Nevada Department of Transportation (NDOT) initiated the design and construction of a freeway system that skirts the downtown area. The project has been phased, with Phase 1B currently under construction. Phase 1A consisted of bridge construction only. Phases 2A ahd 2B are currently in the design process.
机译:由于内华达州北部是该国增长最快的地区之一,因此大量交通和拥堵被带入卡森市的州议会大厦和395号公路,这是贯穿卡森市的主要通道。由于这些原因,内华达州交通运输部(NDOT)着手设计和建设绕过市区的高速公路系统。该项目已分阶段进行,目前正在建设1B阶段。 1A阶段仅包括桥梁建设。目前正在设计阶段2A和2B。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号