SUNSARI MORANG IRRIGATION PROJECT, NEPAL

机译:尼泊尔SUNSARI MORANG灌溉项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Sunsari Morang Irrigation Project is the largest government-operated surface water irrigation project on the Terai Plains in Nepal. Its operation has always been hampered by excessive sedimentation in the canal system and the inadequate conveyance capacity of the secondary river channel connecting the main river channel to the intake. Feasibility studies for headworks improvement and sediment removal works were commissioned to NEDECO in 1988. NEDECO assigned DHV Consultants (as leading partner) and Delft Hydraulics to provide the required expertise for the studies and entered into an association with Nippon Koei Co. Ltd. of Japan, a company with extensive experience of water resources development in Nepal. The subsequent detailed design and construction supervision phase started in 1993 and is being conducted by NEDECO (DHV Consultants BV) in association with the local firms SILT Consultants PVT. LTD. and TAEC Consult PVT. LTD. This article contains a detailed discussion of the project from the feasibility studies in 1988 through to the improvement works due for completion in 1996.
机译:Sunsari Morang灌溉项目是尼泊尔Terai平原最大的政府运营地表水灌溉项目。运河系统中过多的沉积物以及将主要河道与取水口相连的次要河道的输送能力不足,一直阻碍着它的运行。 1988年,NEDECO委托进行了改善渠首工程和泥沙清除工程的可行性研究。NEDECO指派了DHV顾问(作为主要合作伙伴)和代尔夫特液压公司来提供研究所需的专业知识,并与日本日本兴荣株式会社建立了联系。 ,这是一家在尼泊尔拥有丰富水资源开发经验的公司。随后的详细设计和施工监督阶段始于1993年,目前由NEDECO(DHV Consultants BV)与本地公司SILT Consultants PVT联合进行。 LTD。和TAEC咨询PVT。 LTD。本文包含了对该项目的详细讨论,从1988年的可行性研究一直到将于1996年完成的改进工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号