1.1 Production should run parallel to Virginia class submarine construction at two per year 1.2 Upgrades to Los Angeles class submarines were scheduled to be completed by end of 2020 but were likely delayed by 6-12 months due to impact of COVID-19 on shipyard workforces 1.3 Could be installed on the future Columbia class (replaces Ohio class) 1.4 No procurement expected outside the United States.
机译:1.1生产应与弗吉尼亚级潜艇建设平行,每年两个潜艇1.2升级到洛杉矶级潜艇预计将于2020年底完成,但由于Covid-19对造船厂的影响,可能会推迟6-12个月 可以安装在未来的哥伦比亚课程(取代俄亥俄级课程)1.4没有预期在美国以外的采购。