1.Current production to run parallel to Virginia class submarine construction at two per year 2.Upgrades to Los Angeles class submarines was scheduled to be completed by end of 2020 but will likely be delayed by 6-12 months due to COVID-19 3.Likely to be installed on the future Columbia class (replaces Ohio class) 4.No procurement expected outside the United States.