机译:砂土隧穿引起的沉降槽量随深度变化
Southeast Univ, Inst Geotech Engn, Nanjing 210096, Jiangsu, Peoples R China|Tongji Univ, Key Lab Geotech & Underground Engn, Chinese Minist Educ, Shanghai 200092, Peoples R China|Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA;
Southeast Univ, Inst Geotech Engn, Nanjing 210096, Jiangsu, Peoples R China;
Oklahoma State Univ, Sch Civil & Environm Engn, Stillwater, OK 74074 USA;
Southeast Univ, Inst Geotech Engn, Nanjing 210096, Jiangsu, Peoples R China;
Tongji Univ, Key Lab Geotech & Underground Engn, Chinese Minist Educ, Shanghai 200092, Peoples R China|Tongji Univ, Dept Geotech Engn, Shanghai 200092, Peoples R China;
tunneling; subsurface settlement; volume of the settlement trough; physical model test;
机译:沙中的隧道:尺寸,深度和体积损失对未开发土地位移的影响
机译:隧道沙子隧道地下解决估计的经验证据
机译:由桑迪鹅卵石层中双行盾构隧穿引起的表面沉降
机译:隧道相对深度和体积损失对浓砂隧道上方垂直沉降的影响
机译:使用隧道掘进机(波多黎各)在里奥彼德拉斯的Tren Urbano建筑造成的定居点。
机译:重新思考海洋生命周期中的能力:遭受湍流的沙钱幼虫沉降响应的个体发育变化
机译:石柱和张紧的锚,完全消除隧道槽沉降
机译:高速公路路堤下隧道施工引起的沉降