首页> 外文期刊>Journal of Water Resources Planning and Management >Event-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies
【24h】

Event-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies

机译:基于事件的方法,通过资产管理策略优化供水主管的修复时间

获取原文
获取原文并翻译 | 示例
           

摘要

Municipalities with limited budgets will have to rehabilitate their stock of deteriorated water mains in the coming decades. Optimization and asset management offer municipalities the opportunity to plan the rehabilitation of their water mains in a more rational manner. The aim of this paper is to develop a new event-based approach to optimize the timing of water main rehabilitation. The approach incorporates a new gene-coding scheme and covers the full range of decisions about pipe replacement, duplication, lining, new pipe installation, and asset management strategies (infrastructure adjacency and quantity discounts applied to the installed pipe). The new approach is applied to the Fairfield water network, and results suggest that applying a budget constraint prohibits early investment in pipe rehabilitation with a resulting increase in leakage, pipe breaks, and energy costs. Applying pipe discounts decreases capital and operation costs and favors pipe lining over pipe replacement and duplication in the Fairfield network. A sensitivity analysis suggests that uncertainties in demand, leakage, and break growth rate have a moderate to significant impact on capital and operation costs.
机译:预算有限的市政当局将在未来几十年中恢复其退化的水管存量。优化和资产管理为市政当局提供了以更合理的方式规划其水管修复计划的机会。本文的目的是开发一种基于事件的新方法,以优化供水总管的修复时间。该方法采用了新的基因编码方案,涵盖了有关管道更换,重复,衬砌,新管道安装和资产管理策略(基础设施邻接和已安装管道的数量折扣)的所有决策。该新方法已应用于Fairfield供水网络,结果表明,应用预算限制会禁止早期投资于管道修复,从而导致泄漏,管道破裂和能源成本增加。实行管道折扣可以减少资金和运营成本,并且比在Fairfield网络中进行管道更换和复制更有利于管道衬里。敏感性分析表明,需求,泄漏和中断增长率的不确定性会对资本和运营成本产生中度至重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号