Proposed Alternative Delivery System to Current Governmental Housing Program in Kuwait

机译:拟议的科威特政府住房计划替代交付系统

获取原文
获取原文并翻译 | 示例

摘要

This paper presents an alternative project delivery system where there is a need for mass production of housing units while, at the same time, allowing recipients to finish the units in their own way to avoid the problem of them redoing the work if the units are not what they really need. Large numbers of the recipients of governmental houses in Kuwait tend to remodel their newly-awarded houses to fit their needs. When carried out on a large scale, this represents a waste of resources on public funding and imposes costs on the occupants of the government housing units. As a result, this paper suggests that the National Housing Authority (NHA) in Kuwait should consider delivering a "partially constructed houses system" to avoid the substantial rebuilding activities carried out by a large number of occupants. This study documents the effect of the partially constructed housing approach on reducing the waiting period and cost of construction, and on meeting recipients' expectations. In addition, the study recommends different alternative options for when construction should be stopped by the NHA and then continued by the recipients to complete the houses to their own satisfaction.
机译:本文提出了一种替代性的项目交付系统,该系统需要大量生产房屋单元,同时允许接收者以自己的方式完成单元,以避免在不使用单元的情况下重新进行工作的问题。他们真正需要的是什么。科威特的许多官邸接受者往往会对其新授予的房屋进行改建,以适应他们的需求。大规模进行时,这浪费了公共资金的资源,并给政府住房单位的居民带来了成本。因此,本文建议科威特国家住房管理局(NHA)应该考虑提供“部分建造的房屋系统”,以避免大量居住者进行的大量重建活动。这项研究记录了部分建造房屋方法对减少等待时间和建造成本以及满足接受者期望的影响。此外,研究建议NHA何时停止建造,然后让接受者继续建造自己满意的房屋,采取不同的替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号