首页> 外文期刊>Journal of Transportation Engineering >Evaluation of a Signalized Intersection with Hook Turns under Traffic Actuated Control Circumstance
【24h】

Evaluation of a Signalized Intersection with Hook Turns under Traffic Actuated Control Circumstance

机译:交通控制环境下带弯道的信号交叉口评估

获取原文
获取原文并翻译 | 示例
       

摘要

Right-turning vehicles (in countries where vehicles driving on the left-hand-side of the road, e.g.,UK, Australia) have large impacts to the operation of intersections. This paper focuses on a traffic maneuver for right-turning vehicles, named the hook turn (HT), which has been successfully implemented in Melbourne for over 50years. To fully assess the operational performance of the intersection with the HT, two similar intersections are established by a computer model. One intersection plan has the HT maneuver, named the HT plan, and the other one has no HT maneuver, named the traditional plan. Both plans adopt the actuated control method (ACM) for signal settings. For the HT plan, a strategy is developed to cope with the spillover of HT vehicles using the loop detector data; dynamic adjustment of minimum green times is incorporated. With different traffic volumes and vehicle ratios, 24 simulation scenarios are designed. Two classes of indices, average delay and number of vehicles crossing the intersection per hour, are used to assess the performance of the two plans. The simulation results show that the HT plan can only reduce the average delay of through vehicles when the total intersection volume and the ratio of right-turning vehicles are high, and the vehicle capacity of the HT plan is, in general, greater than that of the traditional plan in most scenarios.
机译:右转车辆(在道路左侧行驶的车辆(例如英国,澳大利亚)的国家/地区)对交叉路口的运行产生重大影响。本文着重介绍了一种用于右转车辆的交通机动技术,称为“弯钩(HT)”,该技术已在墨尔本成功实施了50多年。为了充分评估与HT的交叉路口的运营性能,通过计算机模型建立了两个相似的交叉路口。一个交叉口计划有HT机动,称为HT计划,另一个没有HT机动,称为传统计划。两种方案均采用执行控制方法(ACM)进行信号设置。对于HT计划,开发了一种使用环路检测器数据应对HT车辆溢出的策略。动态调整最短绿灯时间。针对不同的交通量和车辆比率,设计了24种模拟方案。平均延误和每小时通过交叉路口的车辆数量两类指标用于评估两个计划的绩效。仿真结果表明,当总交叉路口容积和右转车辆的比例较高时,HT计划只能减少通行车辆的平均延误,并且HT计划的车辆通行能力通常大于通行车辆的通行能力。在大多数情况下都是传统计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号