Block Erection Sequencing in Shipbuilding With General Lifting and Joining Times

机译:具有一般起吊和接合时间的造船中的块安装顺序

获取原文
获取原文并翻译 | 示例

摘要

This article studies the scheduling of block erection in shipbuilding. A mathematical model is formulated to minimize the makespan, i.e., the time between the start and finish of the erection schedule, when there are different lifting and block joining times. Structural stability and the no-skipped-blocks property are taken as constraints. The model is used to study the erection in three special cases. First, the case with a short lifting time is analyzed. Second, a solution is constructed for the case in which joining times are short and, third, the case in which the lifting and joining times are the same is analyzed. The article shows how these three cases can be solved efficiently, and, in addition, it gives insight into the erection scheduling such as the effects of the number of blocks in the horizontal and vertical directions on different joining times.
机译:本文研究了造船中的块体安装计划。制定了数学模型以最大程度地缩短建造时间,即在起吊和砌块连接时间不同的情况下,在安装计划的开始到完成之间的时间。结构稳定性和无跳块特性被视为约束。该模型用于研究三种特殊情况下的勃起。首先,分析起重时间短的情况。第二,针对接合时间短的情况构造解决方案,第三,分析提升和接合时间相同的情况。本文介绍了如何有效解决这三种情况,此外,它还提供了对安装计划的洞察力,例如水平和垂直方向上的砌块数量对不同连接时间的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号