...
首页> 外文期刊>Journal of ship production and design >Ship Repair and Maintenance Management: Application of PERT Analysis on a Tanker Vessel
【24h】

Ship Repair and Maintenance Management: Application of PERT Analysis on a Tanker Vessel

机译:船舶维修和维护管理:Pert分析在油轮船上的应用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The costs in shipbuilding and ship repair and maintenance activities are massive and need several materials in the same production phase. Construction without planning is not rational, and any mistake in the planning phase will cause major loss of time, quality, and financial resources. Planning in ship repair and maintenance yards is more complicated than new building shipyards because the duration time is limited. In this study, 200-m-long tanker's repair and maintenance period has been planned by program evaluation and review technique analysis in light of the data acquired from X shipyard in Turkey to reflect critical activities that affect the total duration time.
机译:造船和船舶维修和维护活动的成本是大量的,需要多种生产阶段的材料。施工无规划并不理性,规划阶段的任何错误都将导致主要的时间,质量和财务资源重大损失。船舶维修和维护码的规划比新的建筑造船厂更复杂,因为持续时间有限。在本研究中,计划评估和审查技术分析计划在土耳其X造船厂获取的数据,以反映影响总持续时间的关键活动,计划通过计划评估和审查技术分析计划进行200米长的油轮维修期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号