Dragline cycle time analysis

机译:拉铲铲循环时间分析

获取原文
获取原文并翻译 | 示例
       

摘要

Draglines operate in a cyclic nature. Excluding the infrequent walking, a dragline spends its major operational time by digging the dirt and paying it out on a spoil pile. Considering the fact that a dragline performs tens of thousands of cycles per year, it is evident that even a small reduction in a single cycle time would result in a significant increase in productivity. Thus, it is to the benefit of a mine that dragline cycles need to be critically analyzed and corrective measures be taken. Although there exist different opinions on what segments constitute a dragline cycle, in this study it is accepted that a dragline cycle is composed of the following phases: (ⅰ) Filling the bucket by dragging it towards the dragline; (ⅱ) Swinging the loaded bucket along a predetermined arc; (ⅲ) Paying out the dirt onto a spoil pile; (ⅳ) Swinging the empty bucket back to excavation face; and (ⅴ) Positioning the bucket to re-load. The study is based on field investigation conducted on six draglines with different capacities and operating modes. Stopwatch study is performed. Influence of cut dimensions, nature of material excavated, mode of digging, type of bucket employed, swing angle, operators' judgements and condition of dragline on cycle time are analyzed. The results are presented by tabular data and illustrations.
机译:拉铲铲是周期性的。除去不常走的路,拉铲索要花费大量的时间来挖土,然后将其支付给弃土堆。考虑到吊索铲每年执行数以万计的循环这一事实,很明显,即使单个循环时间的小幅减少也会导致生产率的显着提高。因此,对铲斗循环进行严格分析并采取纠正措施对煤矿有利。尽管对构成拉铲环的段有不同的看法,但在这项研究中,拉铲环由以下几个阶段组成:(ⅰ)将铲斗向拉铲拖曳来填充铲斗; (ⅱ)沿预定的弧度摆动装载的铲斗; (ⅲ)将污垢撒到弃土堆上; (ⅳ)将空桶摆回挖掘面; (ⅴ)放置铲斗以重新装载。该研究是基于对具有不同能力和操作模式的六个吊索进行的现场调查。进行秒表研究。分析了切削尺寸,开挖物料的性质,挖掘方式,所用铲斗的类型,摆动角度,操作员的判断以及拉铲的状况对周期时间的影响。结果由表格数据和插图表示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号