The decisions made during the preproject planning and design stages are very crucial for infrastructure and underground projects due to the inherent risks and uncertainties in such projects. In the selection of a crossing method, the owner has to consider various factors, including cost, environmental impact, serviceability and maintenance, constructability, and schedule. Unfortunately, this decision is complex due to the numerous variables that need to be considered. When choosing a crossing methodology, the project manager must balance the likely capital cost of the project with the risks inherent in the chosen construction method. Ideally, a project manager would investigate numerous alternatives to fully explore the merits of various construction methods, including the level of risk, before making the final decision. This paper presents the results of an actual project workshop with the objective of selecting the most optimum construction method for the construction of a water transmission main beneath the North Saskatchewan River, in Edmonton, Alberta, Canada. The project used the analytical hierarchy process as a method to capture the risks, merits, and demerits of each construction method. Conventional open trench, horizontal directional drilling, microtunneling, and conventional tunneling were the four methods considered for the project. The paper includes the background information, workshop setting, methodology of the selection criteria, and the results of the workshop considered in selecting the most optimum method for the specific project circumstances. A summary of the design based on the recommended methodology is also presented along with a summary of the crossing construction completed in 2007.
机译:由于此类项目的固有风险和不确定性,因此在项目前规划和设计阶段做出的决定对于基础设施和地下项目至关重要。在选择穿越方法时,所有者必须考虑各种因素,包括成本,环境影响,可维修性和维护性,可施工性和进度。不幸的是,由于需要考虑许多变量,因此此决定很复杂。在选择交叉方法时,项目经理必须在项目的潜在资本成本与所选施工方法固有的风险之间进行权衡。理想情况下,在做出最终决定之前,项目经理会研究多种选择,以充分探索各种施工方法的优点,包括风险程度。本文介绍了一个实际项目研讨会的结果,目的是为加拿大艾伯塔省埃德蒙顿市的北萨斯喀彻温河下面的输水干管选择最优化的施工方法。该项目使用层次分析法作为一种方法来捕获每种施工方法的风险,优点和缺点。常规的明渠,水平定向钻探,微隧道和常规隧洞是该项目考虑的四种方法。该文件包括背景信息,讲习班设置,选择标准的方法以及在针对特定项目情况选择最佳方法时考虑的讲习班结果。还介绍了基于推荐方法的设计摘要以及2007年完成的交叉口建设摘要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号