Industry Perceptions of Alternative Project Delivery Methods Applied to Trenchless Pipeline Projects

机译:行业对非开挖管道项目采用替代项目交付方式的看法

获取原文
获取原文并翻译 | 示例
           

摘要

The majority of trenchless pipeline projects delivered today use the traditional design-bid-build (DBB) system. Alternative project delivery methods (APDM) have been introduced to increase stakeholder integration and ultimately enhance project performance. The complex nature of trenchless pipeline projects renders them ideal candidates for APDM because of the gap that is often created by an inherent lack of technical knowledge exchange between design engineers and contractors when using DBB delivery. The use of APDM is only beginning to gain acceptance for trenchless pipeline projects. This paper has two objectives: (1) to examine the current usage, comfort level, and stakeholder perception of APDM through a survey of the trenchless industry; and (2) to investigate the published cost performance of completed trenchless projects that employed APDM. The results from the industry survey are threefold: (1) the most used project delivery system in the trenchless industry is DBB; (2) the comfort level of stakeholders in implementing each project delivery method is influenced by the amount each method is used; and (3) the industry respondents perceive APDM to impact certain performance metrics more than others. The initial results from the meta-analysis demonstrate the possible performance impact of APDM on trenchless construction projects, as realized through cost savings ranging from 2 to 44%. This study provides a contribution to the body of knowledge by assisting project stakeholders in better understanding the overall industry perceptions of APDM-related performance improvements. This understanding can guide stakeholders in selecting the most suitable delivery system for their trenchless projects.
机译:今天交付的大多数非开挖管道项目都使用传统的设计—投标—建造(DBB)系统。引入了替代项目交付方法(APDM),以增强利益相关者的整合并最终提高项目绩效。非开挖管道项目的复杂性质使其成为APDM的理想选择,因为在使用DBB交付时,设计工程师和承包商之间固有的缺乏技术知识交流常常会造成这种差距。 APDM的使用才刚刚开始被非开挖管道项目接受。本文有两个目标:(1)通过对非开挖行业的调查来检查APDM的当前用法,舒适度和利益相关者的看法; (2)调查采用APDM的已完成非开挖项目的已公布成本绩效。行业调查的结果有三个方面:(1)非开挖行业中最常用的项目交付系统是DBB; (2)实施每种项目交付方法的利益相关者的舒适度受每种方法使用量的影响; (3)行业受访者认为APDM对某些性能指标的影响要大于其他指标。荟萃分析的初步结果表明,通过节省2%至44%的成本,APDM对非开挖建设项目可能产生的性能影响。这项研究通过帮助项目利益相关者更好地了解整个行业对APDM相关性能改进的总体看法,为知识体系做出了贡献。这种理解可以指导利益相关者为他们的非开挖项目选择最合适的交付系统。

著录项

  • 来源
    《Journal of Pipeline Systems Engineering and Practice》 |2016年第1期|04015020.1-04015020.8|共8页
  • 作者单位

    School of Sustainable Engineering and the Built Environment, Arizona State Univ., P.O. Box 873005, Tempe, AZ 85287-3005;

    School of Sustainable Engineering and the Built Environment, Arizona State Univ., P.O. Box 873005, Tempe, AZ 85287-3005;

    School of Sustainable Engineering and the Built Environment, Arizona State Univ., P.O. Box 873005, Tempe, AZ 85287-3005;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号