首页> 外文期刊>Journal of materials in civil engineering >Design and Implementation of Self-Consolidating Concrete for Connecting Precast Concrete Deck Panels to Bridge Girders
【24h】

Design and Implementation of Self-Consolidating Concrete for Connecting Precast Concrete Deck Panels to Bridge Girders

机译:连接桥面预制板的自固结混凝土的设计与实现

获取原文
获取原文并翻译 | 示例
           

摘要

An experimental program was undertaken to develop and evaluate the performance of self-consolidating concrete (SCC) designed for connecting precast concrete deck panels to supporting bridge girders. The effect of curing conditions on early-age expansion and shrinkage of SCC made with expansive materials was evaluated. The effect of batching sequence, concrete temperature, and superplasticizer/water demand on SCC performance was investigated. Field mockup testing was conducted to evaluate the flowability and pumpability of the proposed SCC. Test results showed that the proposed SCC can maintain high filling and passing ability for 2 h and can exhibit adequate stability. The slump flow of the recommended SCC is 730 ± 50 mm (29 ± 2 in.), the L-box blocking ratio is greater than 0.80, the difference between slump flow and J-ring is less than 50 mm (2 in.), and the V-funnel flow time is less than 6 s. The developed SCC mixture was implemented in the construction of the Kearney East Bypass Bridge Project in Kearney, Nebraska, in August 2015. A total of 92 m~3 (120 yd3) of the developed SCC was successfully placed through 100-mm (4-in.) diameter grouting/inspection holes located at 1.2-m (4-ft) spacing on the deck surface. The SCC was found to completely fill the shear pockets and haunches between the deck and the girders.
机译:进行了一项实验计划,以开发和评估自固混凝土(SCC)的性能,该混凝土用于将预制混凝土面板连接到支撑桥梁大梁。评估了固化条件对用膨胀材料制成的SCC的早期膨胀和收缩的影响。研究了配料顺序,混凝土温度和高效减水剂/水需求量对SCC性能的影响。进行了现场模型测试,以评估所提议的SCC的流动性和可泵送性。试验结果表明,所提出的SCC能够保持2小时的高填充和通过能力,并表现出足够的稳定性。推荐的SCC坍落度为730±50毫米(29±2英寸),L形盒的堵塞比大于0.80,坍落度与J形环之间的差小于50毫米(2英寸)。 ,并且V型漏斗的流动时间少于6 s。 2015年8月,在内布拉斯加州的科尔尼的科尔尼东旁路桥项目的建设中实施了已开发的SCC混合物。已成功地将100毫米(4- in。)直径的注浆/检查孔,在甲板表面上的距离为1.2米(4英尺)。发现SCC完全填满了甲板和大梁之间的剪切袋和腰腿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号