Best Practice in the Training, Appointment, and Remuneration of Members of Dispute Boards for Large Infrastructure Projects

机译:大型基础设施项目争议委员会成员的培训,任命和薪酬最佳实践

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper reports part of a qualitative study into evolving practice in the implementation of the dispute adjudication board (DAB) construction dispute resolution technique, a variant of the dispute review board (DRB) concept used in the United States and Canada. Data were collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that the constitution of DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; and the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of a qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.
机译:本文对定性研究的一部分进行了定性研究,该定性研究是实施争端裁决委员会(DAB)施工争端解决技术的实践,这是美国和加拿大使用的争端审查委员会(DRB)概念的一种变体。通过对来自工程和法律领域的20位经验丰富的争议解决从业人员进行的焦点小组访谈收集了数据。该小组由FIDIC-NET成员组成,具有直接的项目DAB经验。此处报告的部分涉及建立DAB的实践和程序。主要发现是,由于项目所有者对DAB流程的不了解或DAB成本的威慑,DAB的构成常常被推迟。这些所有者还倾向于在未充分理解DAB流程的情况下,从当地工程师和律师中任命DAB成员;民建联成员的薪酬率差异很大;民建联成员资格和宣传技巧的培训不足;在选择DAB成员候选人以及谈判每个成员与合同方之间的三方协议的过程中,必须格外小心,以免引起道德问题。研究贡献是三方面的。首先,它强调了在标准框架内为DAB成员提供现实费用对于及时建立一个团队协作良好的董事会的重要性。其次,它说明了使用定性焦点小组访谈从多个利益相关者的角度研究新合同条款的影响。最后,它确定了需要进一步研究的领域。

著录项

  • 来源
    《Journal of Management in Engineering》 |2014年第2期|185-193|共9页
  • 作者单位

    Construction and Engineering Law, Univ. of Wolverhampton, School of Technology, Wulfruna St., Wolverhampton, West Midlands WV1 1SB, U.K.;

    Chartered Civil Engineer, Barrister at Law, Chartered Arbitrator,Adjudicator, and Conciliator/Mediator for construction disputes, Chair of International Federation of Consulting Engineers Adjudication Advisory Panel;

    Project and Transport Infrastructure Management, Head of School of Civil Engineering, Univ. of Leeds, Leeds LS2 9JT, U.K.;

    Construction Management and Economics, Univ. of Reading, School of Construction Management and Engineering, Whiteknights,P.O. Box 219, Reading RG6 6AW, U.K.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Dispute adjudication board; Dispute review board; Project management; World Bank; FIDIC; Contract;

    机译:争议裁决委员会;争议审查委员会;项目管理;世界银行;FIDIC;合同;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号